OMV Talesbrunn Update

Just before the summer break we have managed to install the third unit control panel upgrade for gas compression unit 2 at OMV Tallesbrunn in Austria.

In a few weeks time we will start with the commissioning of the third Solar Saturn 20 gas turbine. The second unit has been completed recently by our commissioning team.

The complete upgrade on the controls side as well as the fuel gas system was designed by Holland-Controls.

What's new on Tallesbrunn:

  •        Controls system upgrade to Allen Bradley Guardlogix with point I/O and integrated Anti-Surge control

  •        Vibration monitoring with Bently Nevada 3701

  •        Over speed protection with Braun Tacho

  •        Co-ax shut-off and vent valves

  •        Fuel gas metering by Meggit XVG

  •        Wonderware based Human Machine Interface

  •        Replaced pressure switches with modern pressure transmitters

More information?

We are here to provide you with more information, answer your question(s) and create the perfect solution for your specific requirements and challenges.